What Road Sections are Planned for Rehabilitation in 2020?

    Road

    From

    To

    CRACK SEALING

    County Road 33

    Bloomfield Main Street

    County Road 64 

    County Road 10

    Cherry Valley

    Milford

    County Road 15

    Demorestville

    CR 49

    MICROSURFACING

    County Road 22

    Kingsley Road

    County Road 10

    County Road 5

    Picton Limits

    Demorestville

    County Road 33

    Rosehall

    Hillier

    County Road 17

    County Road 8

    CR 16

    County Road 7

    Highway 33

    CR 25

    SINGLE SURFACE TREATMENT

    County Road 39

    CR 29

    Edward Dr

    Kleinsteuber Parks Road

    CR11

    CR12

    Bethel Road

    CR4

    CR5

    County Road 35

    Richardson Rd

    Southerly

    Old Milford Road

    McKinley Crossroad

    County Road 17

    County Road 8

    Rock Crossroad

    Dorenburg Lane

    County Road 8

    Kasier Crossroad

    Cressy 

    DOUBLE SURFACE TREATMENT

    Elmbrook Road

    CR5

    Bethesda Road

    Melville Road

    CR2

    Adams Lane

    Kingsley Road

    CR22

    CA 204

    North Marysburgh Court

    Entire Road


    County Road 13

    Babylon Road

    Gravely Bay Road

    Conley Road

    Entire Road


    Kingsley Road

    CA 204

    Old Milford Road

    Bethesda Road

    1km Base Repairs


    Lakeside Drive

    Carnrike Road

    County Road 33

    Closson Road

    Danforth Road

    County Road 2

    What is Crack Sealing?

    Asphalt crack sealing material is used to prevent water from entering the road base and damaging the road during freeze-thaw cycles.   It may also improve ride quality.

    This work will be completed by contract staff.   Staff will monitor works and record the length of road cracks sealed until allocated funding is exhausted.   

    What is Single Surface Treatment?

    One strategy used to extend the lifecycle of surface treated roads is to apply a single surface treatment layer 3-5 years after a double surface treatment (DST) application.  To explain, a double surface treated road should remain in "good" condition for approximately 6-8 years.  By applying another treatment in years 3-5, the pavement condition is extended another 8 - 10 years prior to another treatment.  

    This work is completed by contract staff.  Operations staff perform minimal site preparation works prior to.

    What is Micro Surfacing?

    Micro Surfacing is in general a surface treatment that applies emulsified asphalt and mineral aggregates over a road.  They can be designed to correct rutting, improve inadequate pavement cross sections, and enhance frictional properties of structurally sound polished pavements.  This treatment extends the life of pavement by 4 to 8 years.  

    This work is completed by contract staff.   Operations staff perform minimal site preparation works prior to.

    What is Double Surface Treatment (Reconstruction)?

    Road sections that are at or near complete failure cannot be rehabilitated and must be reconstructed.  A low-cost option is to pulverize the road, re-grade with added granular and apply a Double Surface Treatment (DST).  Some site works such as culvert replacements or ditching is required.   The additional volume of works requested may be in excess of available internal resources to complete.  

    Additional funds are requested to arrange Private Contractors under the supervision of County Staff to perform local repairs and drainage improvements as necessary.